Raymond Central: we can do it

I make a difference

Eldon McFarling's Blog – July 2008 Archive (3)

Auditorium / performance hall

I think a auditorium or performance area is a very important part of any improvement project at Raymond Central, after all the speech team has just won another state title. This makes 14 consecutive state championships. that record is unmatched by any other school in the state! Think about that for a moment.... if the Nebraska football team won 14 national… Continue

Added by Eldon McFarling on July 21, 2008 at 10:40am — No Comments

The jr high wing needs to go

Here is something I looked at really hard. I tried to come up with a solution to make the former military building functional for our school. the biggest problem is the difference in the level between the high school building and the original military buildings. this presents a difficult problem when it comes to access and traffic flow, plus it is an ADA… Continue

Added by Eldon McFarling on July 21, 2008 at 10:36am — No Comments

Moving the 6th grade to the high school

For anyone reading this that is not familiar with the 6th grade at Raymond Central Schools, the Ceresco school is K-5, Valparaiso is K-6 so all 6th grade students from the district attend classes in Valparaiso. Not an ideal situation because of the location



After talking with the elementary principals recently I found out our current buildings are at capacity. The 08-09 kindergarten class is so large it has been split into 4 classes which required some creative re-arranging at both… Continue

Added by Eldon McFarling on July 16, 2008 at 9:00pm — No Comments

Groups

© 2025   Created by Eldon McFarling.   Powered by

Report an Issue  |  Terms of Service